Case studies
Selected work
Descriptions are anonymised — our clients cannot always put their name on them. The numbers and technologies are real.
- Industry
- Own product — mobile app for sailors
- Timeline
- 2 months (May–Jun 2026)
- platforms from one codebase
- 2
- languages
- 7
Sea Spotter — a mobile app for reporting marine mammal sightings
Our own product. Sailors report sightings of dolphins, whales and orcas, and the app turns them into an activity map and alerts others nearby. iOS and Android, multiple languages, subscriptions, AI-powered species-name translation.
Read the case study
- Industry
- Food-service equipment distribution (B2B/B2C)
- platform version
- 2.3 → 2.4.8
- PHP version
- 7.x → 8.3
Upgrading a B2B store across several platform versions — without stopping sales
A food-service equipment distributor's store ran on a platform version no longer receiving security fixes. We prepared a multi-version jump — with new dependency management, search and theme — and a blue-green rollout plan.
Read the case study
- Industry
- SaaS — automotive intelligence (US)
- environments — test, beta, canary, production
- 4
- automated tests in the modernised service
- 0 → 200+
Modernising a SaaS platform — from a decade-old application server to full DevOps
An automotive data platform for the US market ran on an application server more than a decade old and was built by hand. We moved it to a modern stack, built new interfaces for customers and staff, and a complete CI/CD process on our own Kubernetes cluster.
Read the case study
- Industry
- SaaS platform, automotive (US market)
- Timeline
- 7–9 days
- from first code to production
- 4 days
- full UI integration
- 7–9 days
A BPM engine embedded in an existing CRM — in 7–9 days
Long-running customer processes — activating new accounts, reacting to declining activity, collecting confirmations — moved from spreadsheets and sales reps' memory into a BPM engine. Without rebuilding the admin panel the team already worked in.
Read the case study
- Industry
- Manufacturing and trading (SME)
- SMART failure prediction for one of the array's disks
- < 24 h
- power-on hours of the storage disks (10–15 years)
- 88–135k h
IT infrastructure audit — a degraded array and a backup on the same server
A remote audit of a Windows server running Hyper-V and SQL Server, ZFS storage, backups and the firewall of a manufacturing and trading company. We found a ZFS pool running without full redundancy and a disk predicted to fail within 24 hours, before any data was lost. The client received 9 recommendations, ordered the way they need to be carried out.
Read the case study
- Industry
- Own infrastructure — business hosting
- Timeline
- 5 weeks (Jan–Feb 2026)
- DNS zones analysed and verified
- 111
- server decommissioned
- 1
Migrating hosting infrastructure — 100+ DNS zones and mail for dozens of companies
We retired an ageing server, moved authoritative DNS and mail to a new system with full filtering, and brought up new backup infrastructure. Every zone verified, every step with a way back.
Read the case study
- Industry
- Client in the pharmaceutical industry
- Timeline
- 1 week – 2 months per campaign
- to prepare the next campaign, thanks to our own tool
- 1 week
- brands with their own sites
- 5+
Campaign sites for the pharmaceutical industry — education, contests, product pages
For three years we built and ran campaign websites for a client in the pharmaceutical industry — educational sites for pharmacists with a knowledge test, consumer contests and product pages. Thanks to our own quiz tool, subsequent campaigns were ready in a week, with terms, privacy policy and analytics from day one.
Read the case study